As a bulldozer operator, it seems like the crew that knew what they were doing left and a some kids took over. They had a nice edge going, all you have to do is dump the dirt over the edge after that. Easy peasy. No need to cutting a grade at such a steep angle like that. I’d be so pissed off if they spent 30 minutes moving dirt instead of getting a chain and d ring and pulling me out If they did what they did at 25:44, at 0:33, they’d have saved 25 minutes of everybody’s lives including every watcher of this video. I guess the solution is to have a bigger dozer available, a long steel cable, and 20 people to watch you work.